Home Retail & Commerce Retail and commerce | Commercial Renovation

commercial
Renovation

Fit-Out and Transformation During Trading Hours

Transformation and compliance upgrade of commercial
premises with intervention during trading hours.

Fit-out between tenants, renovation to a new brand concept, change of use, compliance upgrade.
COMODO masters the constraints of commercial renovation in active premises.

Commercial renovation is never straightforward. Behind every worksite there is a reopening date, a lease running, a brand concept to respect and often teams waiting to resume their activities. The contractor you choose must understand these stakes as much as the technical ones.

COMODO has been working with retailers, developers and commercial property owners for several years. We have developed a worksite organisation specific to retail: staggered hours where necessary, zone-by-zone phasing to maintain trading, teams dedicated to speed of execution without compromise on quality.

The Situations in Which We Operate

Fit-Out Between Two Tenants

A vacated unit needs to be fully refurbished quickly to welcome the new occupant. COMODO carries out commercial fit-outs with priority-mobilised teams and a tight schedule met. Demolition, reinstatement, fit-out, painting, flooring — everything is coordinated for handover in the shortest possible timeframe.

Renovation to a New Brand Concept

Votre enseigne évolue, votre concept store change, vous avez un nouveau visual merchandising à déployer. COMODO exécute les travaux de rénovation selon les standards de votre marque, charte technique de franchiseur, plans d’aménagement de votre service design ou de votre architecte d’intérieur.

Change of Use

Office to retail, warehouse to showroom, restaurant to boutique. These transformations require mastery of structural constraints, compliance upgrades specific to the new use and full technical coordination.

Energy Renovation of Commercial Premises

Insulation, joinery replacement, upgrade of technical installations (heating, ventilation, LED lighting). COMODO carries out energy renovation of commercial premises while minimising interruption to trading.

Refresh and Reinstatement

Paint, flooring, suspended ceilings, lighting — sometimes a targeted refresh is enough to breathe new life into a commercial space. COMODO works on projects of all sizes, from partial refresh to full renovation.

Renovating Fast and Well: Our Worksite Organisation.

Preliminary assessment, adapted hours, controlled phasing and full coordination

Technical assessment before any quote

Before pricing, we visit the premises and produce a full technical assessment: condition of existing networks, structural constraints, compliance watchpoints. Our quote is based on the reality on the ground, not assumptions.

Worksite hours adapted to your trading

Nights, weekends, staggered hours — if your business cannot stop, we adapt our working hours. Any potential additional cost is priced transparently from the quote stage.

Zone-by-zone phasing to maintain trading

On occupied-site renovations, we work zone by zone with appropriate worksite protections. Your business continues in untouched zones while we work on the renovation zones.

Renovation + visual activation at the same time

Use the renovation to also refresh your signage, wayfinding and window dressing. HELLO DECO (DG Group) coordinates its intervention with COMODO for simultaneous delivery. One worksite, one schedule.

Recent Projects

Discover some of our Retail and commerce | Commercial Renovation achievements.
Deadlines

4 to 8 weeks

Intervention

Open businesses

Assessment

Free & comprehensive

Fit-out

Ultra-fast

Frequently Asked Questions

What is the minimum timeframe for a full renovation of a standard-sized commercial unit?

For premises of 100 to 300 m², a complete renovation (demolition, finishing works, flooring, painting, lighting) generally takes 4 to 8 weeks depending on the initial condition and the desired level of finish. This timeframe is confirmed after a site visit and assessment.

Yes. We are accustomed to working outside normal hours in commercial premises that cannot close. The conditions (potential additional cost, safety organisation) are defined in advance and included in the quote.

We establish a precise phasing plan with clearly defined work zones, adapted protections (tarpaulins, temporary partitions, dust management) and a schedule validated with you week by week. The safety of your teams and customers is our absolute priority

Yes. We regularly work with franchisor technical specifications. Send us your network's technical requirements, we will review them, identify the key points of attention and confirm our ability to execute them before signing.

We can assist you with the administrative procedures or manage them entirely according to your preferences. Road permits, works declarations, coordination with the co-ownership — we are well acquainted with these procedures in Luxembourg.

START YOUR PROJECT

Tell us about your commercial project.

Send us your brief. We will come back with a detailed technical and budget proposal.