End-to-end support.
One partner, one point of contact, every interior trade coordinated under a single responsibility.
You design. We coordinate everything else.
COMODO supports interior architects across their entire projects: bespoke joinery, finishes, partitions, bathrooms, painting, lighting. From reading the plans to clearing the snag list, you keep a single point of contact and an execution faithful to every one of your specifications.
Execution faithful to your plans
No unapproved interpretation
Single point of contact
From first plan to handover
All trades coordinated
Under one responsibility
Contractual deadlines
Schedule agreed with you
An interior design project lives in the details: a poorly handled junction, a material swapped without approval, one trade that doesn’t talk to another, and the whole intent of the design collapses. The risk is rarely the talent. It’s the coordination.
That is exactly what COMODO takes on. A dedicated project manager reads your plans, anticipates the service voids, floor build-ups and duct runs from the design stage, then directs every trade through to the final finish. Every decision goes through you, every junction detail is approved. Your project stays your project, down to the last centimetre.
Our support, step by step
01
Reading the plans & technical anticipation
Study of your execution drawings, on-site dimension checks, anticipation of service voids, floor build-ups, duct runs and critical junctions, from the design stage.
02
Technical study & detailed proposal
Quantities, material selection to your specifications, samples submitted for approval. Itemised price offer and a contractual schedule.
03
Pre-construction coordination
Preparation meeting, schedule validation, setting up the interfaces between trades, checking access and site constraints.
04
Coordinated execution & reporting
Every trade directed under a single responsibility. Dedicated project manager, weekly progress report, follow-up photos, quick decisions.
05
Handover & snag clearance
Participation in the formal handover, snags cleared within the agreed timeframe, delivery of the as-built file (handover documentation / DOE).
Recent Projects
Frequently asked questions
At what stage can COMODO get involved?
As early as the technical-plans stage, to anticipate service voids, floor build-ups, duct runs and junction details. The earlier we get involved, the more smoothly the project runs.
How is coordination between the different trades handled?
COMODO directs all interior trades (joiner, tiler, dryliner, painter, plumber) under a single responsibility. You have one point of contact for the whole project.
Does COMODO work with our suppliers and specified materials?
Yes. We work to your specifications : mandated suppliers, exact references, specific finishes. If an alternative is needed, it is submitted for your approval before any procurement.
Can we entrust COMODO with all the interior works or only certain trades?
Both. You can hand us the entire interior fit-out or a single targeted trade. Either way, the responsibility and the point of contact remain single.
Does one contact follow the project from plan to handover?
Yes. A dedicated project manager knows your file in detail, attends site meetings and is directly reachable, from the first plan through to snag clearance.