Your Design Executed with Precision

Interior transformation and fitting out in Luxembourg: your
design executed with precision.

Space redistribution, creation of openings, change of use, reconfiguration of open-plan floors. COMODO executes
your interior transformation projects with the technical precision and attention to detail your design deserves.

Types of Transformations COMODO Delivers

Space Redistribution

Creating new partitions, demolishing existing partitions, complete floor-level redistribution. We carry out these works in coordination with technical trades to avoid conflicts with existing networks.

Creating Openings in Load-Bearing Walls

Installation of steel beams (IPN), steel girders or reinforced concrete beams. Every structural intervention is preceded by an opinion from the structural design office and carried out with the necessary temporary supports.

Change of Building Use

Conversion of offices into housing, retail into cultural spaces. These projects combine interior redistribution, compliance upgrades and renovation of technical installations.

Reconfiguration of Commercial Open-Plan Floors

Partitioning, suspended ceilings, wall linings, cabling. Tight deadlines, clean worksite, zone-by-zone delivery.

Renovation of Common Areas

Entrance halls, circulation areas, stairwells, lifts. Common areas reflect the overall quality of a building. We renovate them to a finishing standard consistent with your design.

Our Technical Approach to Transformations

Assessment Before Any Opening

Before creating or enlarging an opening, we carry out a survey to verify the nature of the wall, identify passing networks and assess the condition of the substrate. This step is non-negotiable.

Technical Trade Coordination

Relocation of ducts, modification of the electrical panel, relocation of radiators or ventilation grilles. We coordinate these trades with the fit-out works to avoid interference and remedial work.

Finishing Quality Control

Verticality of partitions, suspended ceiling levels, flatness of tiling, joint regularity. We carry out systematic self-inspections before declaring a zone ready for handover.

Frequently Asked Questions

How does COMODO identify load-bearing walls before an interior transformation?

We carry out a preliminary survey on every wall affected by a modification. In cases of doubt, we bring in a structural design office before making any execution commitment.

We map out the existing networks before the start of demolition works. Each crossing network is documented and its treatment is validated with the relevant technical lots and the architect.

Yes. We divide the construction site into successive geographical phases. Each phase is delivered clean and functional before the start of the next one.

We apply the execution tolerances of the applicable standards. On demanding architectural projects, we discuss with the architect the specific tolerances to be applied and document them in our site quality plan.

LET'S COLLABORATE

Let's talk about your architectural project.

Send us your plans or project brief. We will come back with a technical analysis and a detailed budget proposal.